High Quality Cryogenic LNG Storage Tank for Sale

High Quality Cryogenic LNG Storage Tank for Sale

Testing Machinery: PRODUCTION PROCESS OF STORAGE TANKS 1). cutting materials 2). rolling machines for circling 3). weldi
Basic Info
Model NO. lng storage tank for sale
Independent Suspension Type Multi-link Type
Shape Flatbed
Axle Number 3
Tire Number 12
Material Steel
Condition New
Volume 42000L
Axle Brand Fuwa 13ton Axle
Traction Pin 90mm
Spare Wheel Bracket 2 Pieces
Tool Box 1 Standard
Transport Package Nude
Specification CCC, ISO, WMI, BV
Trademark Chengshida
Origin China
HS Code 8716900000
Production Capacity 1000units Every Year
Product Description

High Quality Cryogenic LNG Storage Tank for Sale

 


Plate Bending Machine

W11

4

3.0

Acceptable

Submerged Arc Machine

MZ-1000

4

2.0

Acceptable

Welding Machine

NBC-500

50

3.0

Acceptable

Chamfering Machine

BBJ-12

1

3.0

Acceptable

Drilling Machine 1

ZQ3080

5

3.0

Acceptable

Lathe 1

CW61100

1

3.0

Acceptable

Small Vertical Lathe

C512A

2

3.0

Acceptable

Large Vertical Lathe

CY5112

1

2.0

Acceptable

Lathe 2

CQ5250-Y

1

2.0

Acceptable

Drilling Machine 2

GXK2020BU

1

2.0

Acceptable

Thread Rolling Machine

Z28-100

1

2.0

Acceptable

Resistance Furnace

RT

1

3.0

Acceptable

Shearing Machine

QC12Y

1

3.0

Acceptable

Grinding Machine

M1332B

2

3.0

Acceptable

Milling Machine

X50A

5

3.0

Acceptable


Testing Machinery:

Machine Name

Brand & Model No.

Quantity

Number of Year(s) Used

Condition

Micrometer

500-600mm

5

3.0

Acceptable

Universal Testing Machine

WE-60

1

3.0

Acceptable

Constant Temperature Drying Oven

101

1

3.0

Acceptable

Vernier Caliper

100cm

10

2.0

Acceptable

Box-type Resistance Furnace

SX2

1

3.0

Acceptable

Photometer

72

1

3.0

Acceptable

Impact Testing Machine

JB-300B

1

2.0

Acceptable


High Quality Cryogenic LNG Storage Tank for Sale


PRODUCTION PROCESS OF STORAGE TANKS

1). cutting materials
2). rolling machines for circling
3). welding and NDT inspection
4). re-circling after welding
5). outer vessel's abrasive blasting and anticorrosive painting for outside surface
6). pipe connecting and assembly of inner vessel and outer vessel
7). valves installation
8). perlite filling
9). vacuum-pumping
10). final painting and ready for shipment